Lintel

Housing production · design space · pre-gate

The same failures, as combinations

Every housing production system answers the same sixteen questions. This page holds one answer set per question — 66 alternatives in all — the 22 couplings hypothesised between them, and the 19 systems that have actually been run or proposed, each recorded as one combination. Pick answers and the board reports which couplings hold, which break, and whether any recorded case has ever run that set.

Nothing here is a finding. Every coupling is a hypothesis about interdependence and carries a grade — 18 Untested, 4 Contested. The layers and the rank order are computed from the coupling register, not assigned. Where a coupling is contradicted it is contradicted as assigned, which may mean the assignment is wrong rather than the coupling.

And the figures on this page are sourced but not graded. 30 of them are quoted from a named source that no row in this project’s evidence register carries, so they do not have the grade and review date every claim on the rest of this site does. They are shown because the cases are worth recording with their numbers attached, and marked because the footer below promises grading that this page alone does not provide. Promoting one means opening its source and grading it.

01The slots, as layers

The slots as interconnected layers

Layer and order are derived from the coupling register, not assigned: a slot sits beneath every slot that depends on it, and the 5 layers below are the longest chain of prerequisites underneath each one. Edges light up for the combination selected in the next section. S16 is a meta-slot about the path rather than the system and is not layered.

nothing selected

The controls above need JavaScript. Without it the diagram, the case matrix, the rank order, the coupling register and the sources below all still read; only the live selection does not.

LAYER 0settled firstLAYER 1LAYER 2LAYER 3LAYER 4settled lastK01: not in playK08: not in playK03: not in playK16: not in playK21: not in playK18: not in playK02: not in playK09: not in playK14: not in playK15: not in playK22: not in playK20: not in playK22: not in playK07: not in playK15: not in playK04: not in playK17: not in playK05, K06: excludes — not in play×K12: excludes — not in play×Construction standardnot setS01 · leverage 7Approval objectnot setS02 · leverage 4Checking mechanismnot setS03 · leverage 1Siting authoritynot setS04 · leverage 8 · ↻ K13Assent mechanismnot setS05 · leverage 9Land supplynot setS06 · leverage 1Design originationnot setS07 · leverage 1Product architecturenot setS08 · leverage 2Interface standardnot setS09 · leverage 2Production organisationnot setS10 · leverage 0Delivery and site assemblynot setS11 · leverage 0Workforcenot setS12 · leverage 0Demand mechanismnot setS13 · leverage 3Title and financenot setS14 · leverage 4Defect liabilitynot setS15 · leverage 0
  • requires / enables
  • excludes
  • holds
  • violated
  • enabler missing
Slots arranged by dependency layer; an arrow runs from the slot that has to be settled first to the slot that depends on it. Layer and order are derived from the coupling register, not assigned.

02One answer per question

Configure a combination

One answer to each question. Pick two only where a system carries both — HUD-code approves the type and the plant, so it carries two answers in that slot. The letters mark where an alternative comes from: L Lintel, C1–C3 the three cold reads, H history, Q the status quo.

Construction standard

What may be built, and is the rule the same everywhere?

S01 · L0

Approval object

What is approved: each house, the design, the plant, or the checker?

S02 · L2

Checking mechanism

How is conformance checked, and by whom?

S03 · L3

Siting authority

Who decides a house may go on this parcel, and by what kind of rule?

S04 · L1

Assent mechanism

How are incumbents (existing owners, neighbours, localities) brought to accept new housing?

S05 · L0

Land supply

Where do buildable parcels come from?

S06 · L0

Design origination

Where does the design of a given house come from?

S07 · L3

Product architecture

What physically is the house and where is it made?

S08 · L3

Interface standard

How do parts from different makers fit together?

S09 · L1

Production organisation

Who builds it, organised how?

S10 · L2

Delivery and site assembly

How does the house get onto the parcel and become occupiable?

S11 · L4

Workforce

Who does the work and how are they employed and trained?

S12 · L4

Demand mechanism

How are orders generated, and what keeps them continuous?

S13 · L2

Title and finance

How is the house paid for, and what is it legally while being paid for?

S14 · L0

Defect liability

Who is liable for defects and carries the warranty?

S15 · L4

First mover

Who acts first to change the system?

S16 · meta

No combination selected

Load a recorded case, or pick an answer to any question.

Nearest cases

Distance is the number of slots where the case's recorded answer differs from the selection; only slots the case has on record are compared.

  • Select at least one answer.

Couplings touched by this selection

  • No coupling is in play yet.
Export as assignments.csv rows

0319 cases · 1 baseline · 9 historical · 5 running · 4 proposals

Cases as combinations

Each row is one combination that was run, is running, or has been proposed. Cells in italic are this session's reading of the record rather than a cited statement — 130 of the assignments are marked that way; an em dash means no record. Cells that match the current selection are marked.

CaseOutcomeS01 Construction standardS02 Approval objectS03 Checking mechanismS04 Siting authorityS05 Assent mechanismS06 Land supplyS07 Design originationS08 Product architectureS09 Interface standardS10 Production organisationS11 Delivery and site assemblyS12 WorkforceS13 Demand mechanismS14 Title and financeS15 Defect liabilityS16 First mover
Baseline
US site-built status quoongoing · United States
summary
Dominant production system. 7.4 months start-to-completion in 2025 per register E-002. Productivity plateau since 1970 per register E-015.SRC-01; SRC-02; SRC-21:E-002; SRC-21:E-015
dominantLocal variantEach projectPublic reviewLocal discretionaryCompensationDeveloper subdivisionsPlan libraryStickDe facto openFragmented subsSerial tradesItinerant tradesProject-by-projectConstruction loanBuilder
Historical
HUD-code manufactured housing, 1976-19971976-1997 · United States
summary
Federally preempted construction standard; siting left local; chattel title. Shipments peaked at 373,143 in 1998, just after this period, and stood at 102,738 in 2025 — still under a third of peak — per register E-012. Cheapest new housing produced.SRC-21:E-012; SRC-21:E-051; SRC-21:E-132; SRC-19
survived-quarantinedNationalType + PlantPrivate agencyLocal discretionaryNone / overrideLand-leaseCatalogChassisProprietaryMany plantsDealer deliveryFactory + crewsDealer inventoryChattelManufacturerNational gov
HUD-code industry, 1998-2004 (securitised chattel episode)1998-2004 · United States
summary
Shipments 373,143 (1998) to 130,748 (2004), a 65% fall during the largest site-built boom in decades; repossession glut (Oakwood, Conseco). Varies one slot from C01: title and finance.SRC-21:E-012; SRC-21:E-129
NationalType + PlantPrivate agencyLocal discretionaryNone / overrideLand-leaseCatalogChassisProprietaryMany plantsDealer deliveryFactory + crewsDealer inventorySecuritised chattelManufacturerNational gov
Operation Breakthrough (HUD)1969-1976 · United States
summary
22 producers from 236 proposals; ~2,800-2,900 prototype units at nine sites; ~$72M federal cost. GAO: market aggregation not performed as anticipated; continuous demand not achieved; subsidised programmes suspended at start of 1973.SRC-04; SRC-05
endedLocal variantEach projectPublic reviewLocal discretionaryNone / overrideGov-assembledPlan libraryVolumetric + PanelisedProprietaryMany plantsSet + button-upMixedSubsidyGov loanBuilderNational gov
Lustron Corporation1948-1950 · United States
summary
2,498 enamelled-steel houses; $12.5M initial RFC loan, over $37M total; builder-dealer network; lost money on each house; RFC recalled loans 1950; local ordinances (steel chimneys) obstructed placement.SRC-06; SRC-07
failedLocal variantEach projectPublic reviewLocal discretionaryNone / overrideExisting stockCatalogPanelisedProprietaryIntegrated firmSet + button-upMixedDealer inventoryGov loanCompany
Katerra2015-2021 · United States
summary
About $2B raised (SoftBank-led); Chapter 11 June 2021 with liabilities $1-10B. Company-stated causes: pandemic, loss of bonding after Greensill's insolvency, inability to raise capital and business.SRC-08; SRC-09
failedLocal variantEach projectPublic reviewLocal discretionaryNone / overrideDeveloper subdivisionsCatalogPanelised + VolumetricProprietaryIntegrated firmSet + button-upMixedProject-by-projectConstruction loanBuilderCompany
Singapore CORENET e-PlanCheckc.2002-2010s · Singapore
summary
Automated code checking over bespoke buildings; 'died silently, the reasons are unclear' (Potter, per register E-128). CORENET X soft-launched 2023-12-18 with an Automated Model Checker still 'under development'.SRC-21:E-128; SRC-18; SRC-23
endedNationalEach projectAuto / written codesNational sitingNational gov
ICC SMARTcodes2006-2010 · United States
summary
Automated checking initiative; ended 2010 for lack of funding per register E-127.SRC-21:E-127
endedLocal variantEach projectAuto / written codesLocal discretionaryConsortium
Fiatech AutoCodes2011-2015 · United States
summary
Proof of concept Jan 2012 on IBC Ch. 10-11 with 13 jurisdictions; identical 137-sheet set drew 1 to 43 issues; 'review inconsistency is the norm'; scaled back.SRC-21:E-125; SRC-21:E-126
pilot-endedLocal variantEach projectAuto / written codesLocal discretionaryConsortium
NYC FORNAX / ICC pilot2005 · United States
summary
Completed pilot reported in AECbytes (Khemlani, 2005-10-26); no adoption; rests on one vendor-adjacent trade article, per register E-080/E-081.SRC-21:E-080; SRC-21:E-081
pilot-endedLocal variantEach projectAuto / written codesLocal discretionaryConsortium
Running
Honolulu CivCheck pre-application check2026- · United States
summary
Jurisdiction mandates an automated pre-application check from 2026-09-01 (register E-117): a city buying the automation itself.SRC-21:E-117
startedLocal variantEach projectAuto / written codesLocal discretionaryState statute
Japan industrialised housing (Sekisui House, Daiwa House and peers)1960s- · Japan
summary
Type conformity certification (Art. 68-10) and manufacturer certification (Art. 68-11) omit building-confirmation review of covered provisions; 13 national use zones; 114,729 prefab completions FY2023 = 14.3% of all starts (JPA).SRC-13; SRC-14; SRC-15
runningNationalType + PlantPrivate agencyLocal envelopeNone / overrideExisting stockCatalogPanelisedProprietaryIntegrated firmSet + button-upFactory + crewsProject-by-projectMortgage at deliveryManufacturerNational gov
Sweden factory-built single-family housing1970s- · Sweden
summary
Municipal planning monopoly (PBL 1 kap. 2 §); national building regulations; catalog houses the norm. Prefab share widely cited at 80%+ but NOT verified in this session.SRC-16; SRC-24
runningNationalEach projectPublic reviewLocal envelopeNone / overrideGov-assembledCatalogPanelisedProprietaryMany plantsSet + button-upFactory + crewsProject-by-projectNational gov
Singapore HDB with PPVC1960- · Singapore
summary
Public developer with standing demand; state as landowner; PPVC required on selected non-landed residential GLS sites since 2014-11-01 (BCA). Resident share in HDB flats NOT verified in this session.SRC-17; SRC-18
runningNationalEach projectPublic reviewNational sitingState landownerGov-assembledPlan libraryVolumetricProprietaryMany plantsSet + button-upMixedPublic orderGov loanStateNational gov
California ADU state preemption2017- · United States
summary
2016 AB 2299 / SB 1069 preempted local ADU rules; permits from just over 1,000 (2016) to over 24,000 (2022); 80,000+ since 2016 (BPC citing HCD; CA YIMBY 83,865). 2019 bills not verified.SRC-10; SRC-11; SRC-12
runningState-uniformEach projectPublic reviewState preemptionIncumbent gainsExisting stockBespokeStickDe facto openFragmented subsSerial tradesItinerant tradesProject-by-projectBuilderState statute
Proposals — combinations nobody has run
Lintel (as recorded in project notes)2026 · United States
summary
HUD-code type as vehicle; conformance authority (certify the checker); preempting siting standard as the missing instrument; private matching layer; incumbent homeowners as suppliers; insured checker liability.SRC-21
proposalNationalType + Plant + CheckerPrivate agency + Auto / written codesNational sitingIncumbent gainsExisting stockCatalogChassisProprietaryMany plantsSet + button-upFactory + crewsPrivate aggregationMortgage at deliveryCheckerCompany
Cold read 12026 · United States
summary
Open national platform; type and plant certification; by-right siting with site profiles; ~150 regional plants; sold like a car; public buyer of last resort.SRC-22
proposalNationalType + PlantAuto / authored rules + Self-cert, auditedLocal envelopeNone / overrideLot productionCatalogVolumetricFormal openPlants on standardParallel setFactory + crewsPublic order + Project-by-projectMortgage at deliveryManufacturerNational gov
Cold read 22026 · United States
summary
Approve the design once; hybrid cores plus panels; digital lot passport with local envelopes; open interface standard; many small factories; mortgage at delivery; countercyclical public buyer.SRC-22
proposalNationalType + PlantAuto / authored rules + Self-cert, auditedLocal envelopeNone / overrideExisting stockCatalogCores + panelsFormal openPlants on standardParallel setFactory + crewsProject-by-project + Public orderMortgage at deliveryManufacturerNational gov
Cold read 32026 · United States
summary
Certification replaces permitting; lot certified separately; site-ready-lot industry; helical piles; several hundred plants; federal standing counter-cyclical order book.SRC-22
proposalNationalType + PlantAuto / authored rules + Self-cert, auditedNational sitingNone / overrideLot productionCatalogVolumetricFormal openPlants on standardParallel setFactory + crewsPublic order + Project-by-projectMortgage at deliveryManufacturerNational gov

04Derived, not assigned

Rank-ordered slot list

Rank rule: layer ascending (how many prerequisite slots sit beneath it), then leverage descending (how many slots depend on it); both derived from the requires and enables couplings, not assigned; S16 is a meta-slot about the path and is not ranked.

RankSlotLayerLeverageQuestionRequiresEnablesAlternatives
1Assent mechanismS05L09How are incumbents (existing owners, neighbours, localities) brought to accept new housing?The political complement to S04; a rule can exist and still be resisted.Siting authorityNone / override · Incumbent gains · Compensation · State landowner
2Construction standardS01L07What may be built, and is the rule the same everywhere?Covers the technical code only; who approves against it is S02, who checks is S03.Approval object, Interface standard, First moverLocal variant · State-uniform · National
3Title and financeS14L04How is the house paid for, and what is it legally while being paid for?Chattel vs real property; construction loan vs mortgage at delivery; who carries inventory risk.Demand mechanismChattel · Construction loan · Mortgage at delivery · Gov loan · Securitised chattel
4Land supplyS06L01Where do buildable parcels come from?Stock vs flow of placeable land; distinct from who may site on it (S04).Delivery and site assemblyExisting stock · Developer subdivisions · Lot production · Land-lease · Gov-assembled
5Siting authorityS04L18Who decides a house may go on this parcel, and by what kind of rule?Zoning, setbacks, use; distinct from the construction code (S01).Assent mechanismApproval object, Demand mechanismLocal discretionary · Local envelope · State preemption · National siting
6Interface standardS09L12How do parts from different makers fit together?Proprietary, de facto open, or formally open; independent of S08.Construction standardProduction organisation, Delivery and site assemblyProprietary · De facto open · Formal open
7Approval objectS02L24What is approved: each house, the design, the plant, or the checker?The unit that carries the approval. More than one may apply (e.g. type and plant).Construction standard, Siting authority, First moverChecking mechanism, Design origination, Defect liability, First moverEach project · Type · Plant · Checker
8Demand mechanismS13L23How are orders generated, and what keeps them continuous?Speculative, dealer inventory, private aggregation, subsidy, public standing order.Siting authority, Title and finance, First moverProduct architectureProject-by-project · Dealer inventory · Private aggregation · Subsidy · Public order
9Production organisationS10L20Who builds it, organised how?Fragmented subs, one integrated firm, many plants with or without a shared standard.Interface standardFragmented subs · Integrated firm · Many plants · Plants on standard
10Product architectureS08L32What physically is the house and where is it made?Stick, chassis, volumetric, hybrid, panel, printed.Demand mechanismWorkforce, Defect liabilityStick · Chassis · Volumetric · Cores + panels · Panelised · Printed
11Checking mechanismS03L31How is conformance checked, and by whom?Human vs private vs automated; distinct from what is approved (S02).Approval objectDelivery and site assemblyPublic review · Private agency · Auto / written codes · Auto / authored rules · Self-cert, audited
12Design originationS07L31Where does the design of a given house come from?Bespoke, builder library, or certified catalog; independent of physical architecture (S08).Approval objectDefect liabilityBespoke · Plan library · Catalog
13Delivery and site assemblyS11L40How does the house get onto the parcel and become occupiable?Foundation, transport, set, connection, final inspection sequencing.Checking mechanism, Land supply, Interface standardSerial trades · Set + button-up · Parallel set · Dealer delivery
14WorkforceS12L40Who does the work and how are they employed and trained?Itinerant trades vs factory employees plus set crews vs mixed.Product architectureItinerant trades · Factory + crews · Mixed
15Defect liabilityS15L40Who is liable for defects and carries the warranty?Builder, manufacturer, certified checker, or the state.Approval object, Design origination, Product architectureBuilder · Manufacturer · Checker · State
First moverS16metaWho acts first to change the system?Meta-slot about the path, not the system; excluded from layer computation.Construction standard, Approval objectApproval object, Demand mechanismNational gov · State statute · Company · Consortium

0522 hypotheses · 18 Untested, 4 Contested

Coupling register

Every coupling is a hypothesis about interdependence. All 22 started Untested; 4 — K04, K12, K13, K16 — were regraded Contested on the first pass because a case that is running violates them as assigned. Each row names the cases that suggest it and the evidence that would move it.

Read against the recorded cases

A coupling violated by a case that is running or dominant is contradicted by the record as assigned; a coupling violated by a case that failed is consistent with it. Cases that survived quarantined, or started too recently to count, are listed on the coupling rather than here. None of this is proof — every case differs on several slots at once — but a contradiction is a reason to regrade the coupling or to re-read the assignment.

K01requiresType (S02b) | Plant (S02c) → requires National (S01c)Untestednot in play

Approval attached to a type or plant is void across jurisdictions unless one standard applies everywhere.

Against the record
no surviving case violates it
Evidence cases named
HUD-code manufactured housing, 1976-1997; Japan industrialised housing (Sekisui House, Daiwa House and peers)
What would move it
A case where type approval travelled under variant local codes.
Origin
this session
K02requiresType (S02b) → requires Local envelope (S04b) | State preemption (S04c) | National siting (S04d)Untestednot in play

A certified type under discretionary local siting is legal but unplaceable: it gets quarantined.

Against the record
no surviving case violates it · consistent with the failure of HUD-code industry, 1998-2004 (securitised chattel episode) · also violated by HUD-code manufactured housing, 1976-1997 (outcome ambiguous: survived but quarantined, or too recent to count)
Evidence cases named
HUD-code manufactured housing, 1976-1997; Japan industrialised housing (Sekisui House, Daiwa House and peers); California ADU state preemption
What would move it
Gate 0 placement test; a jurisdiction admitting certified types by right with measured uptake.
Origin
Lintel notes (1976 diagnosis)
K03requiresAuto / written codes (S03c) | Auto / authored rules (S03d) → requires Type (S02b)Untestednot in play

Automated checking has ended every time it was run over bespoke buildings against human-written codes; it has never been run over the residual site check for a certified type.

Against the record
no surviving case violates it · consistent with the failure of Singapore CORENET e-PlanCheck, ICC SMARTcodes, Fiatech AutoCodes, NYC FORNAX / ICC pilot · also violated by Honolulu CivCheck pre-application check (outcome ambiguous: survived but quarantined, or too recent to count)
Evidence cases named
Singapore CORENET e-PlanCheck; ICC SMARTcodes; Fiatech AutoCodes; NYC FORNAX / ICC pilot; Honolulu CivCheck pre-application check
What would move it
Honolulu CivCheck results after 2026-09-01; Gate 0 objective-share and inter-reviewer agreement measured.
Origin
this session, from register E-082/E-126
K04requiresChassis (S08b) | Volumetric (S08c) | Cores + panels (S08d) | Panelised (S08e) → requires Dealer inventory (S13b) | Private aggregation (S13c) | Subsidy (S13d) | Public order (S13e)Contestednot in play

A fixed-cost plant needs continuous demand; the mechanism that failed differs in each US case, and Japan runs on private orders, so 'non-speculative' is not the condition — 'continuous' is.

Against the record
contradicted by Japan industrialised housing (Sekisui House, Daiwa House and peers), Sweden factory-built single-family housing · consistent with the failure of Katerra
Evidence cases named
Operation Breakthrough (HUD); Lustron Corporation; Katerra; Japan industrialised housing (Sekisui House, Daiwa House and peers); Sweden factory-built single-family housing
What would move it
Contested on the first pass: Japan and Sweden run factory products on private orders as assigned. Either the alternatives in S13 need a 'steady private orders' entry or the coupling is wrong; re-read C10/C11 S13 before regrading.
Origin
this session
K05excludesChassis (S08b) × excludes Securitised chattel (S14e)Untestednot in play

Chassis homes financed by securitised chattel loans with loosened underwriting produced a repossession glut and a 65% shipment fall during a site-built boom.

Against the record
no surviving case violates it · consistent with the failure of HUD-code industry, 1998-2004 (securitised chattel episode)
Evidence cases named
HUD-code industry, 1998-2004 (securitised chattel episode)
What would move it
Register E-012 and E-129 are already Confirmed; the coupling needs the counterfactual: did any lender hold underwriting and avoid the glut?
Origin
Lintel notes
K06excludesMortgage at delivery (S14c) × excludes Chassis (S08b)Untestednot in play

A home that is legally a vehicle (permanent chassis) is titled and financed as one; real-property mortgage at delivery cannot attach while the chassis defines the product.

Against the record
no surviving case violates it
Evidence cases named
HUD-code manufactured housing, 1976-1997
What would move it
Read the July 2026 statute on the chassis requirement; check state conversion statutes (NCLC review: about three-quarters of states).
Origin
Lintel notes (chassis accident)
K07enablesFormal open (S09c) → enables Plants on standard (S10d)Untestednot in play

A published interface standard lets many makers compete on one product and lets learning compound; no US factory-housing case has run it, while site-built runs on a de facto one.

Against the record
no surviving case violates it
Evidence cases named
US site-built status quo; Lustron Corporation; Katerra; HUD-code manufactured housing, 1976-1997
What would move it
Any factory-housing market with a published interface standard and multiple makers building to it.
Origin
cold reads
K08requiresFormal open (S09c) → requires National (S01c)Untestednot in play

An interface standard only holds if the approval regime is uniform; local code variation breaks interchangeability.

Against the record
no surviving case violates it
Evidence cases named
none
What would move it
A case of a shared interface standard surviving under variant codes.
Origin
this session
K09requiresPrivate aggregation (S13c) → requires Local envelope (S04b) | State preemption (S04c) | National siting (S04d)Untestednot in play

A private matching layer is only as good as the placement test: permission recorded is not placement tested.

Against the record
no surviving case violates it
Evidence cases named
none
What would move it
Run the Gate 0 placement-gap protocol on the National Zoning Atlas method.
Origin
Lintel notes
K10requiresPublic order (S13e) → requires National gov (S16a)Untestednot in play

A public standing order is only as durable as the political commitment behind it; one decision can withdraw it.

Against the record
no surviving case violates it
Evidence cases named
Operation Breakthrough (HUD); Singapore HDB with PPVC
What would move it
Comparative reading of why HDB's commitment held for decades and Breakthrough's did not.
Origin
this session
K11requiresChecker (S02d) → requires State statute (S16b)Untestednot in play

Certifying the checker needs a statute or a jurisdiction that accepts an outside determination in place of first-pass review.

Against the record
no surviving case violates it
Evidence cases named
Honolulu CivCheck pre-application check
What would move it
One jurisdiction accepting an outside determination in writing; Florida private-provider uptake data (register E-089).
Origin
Lintel notes
K12excludesIntegrated firm (S10b) × excludes Project-by-project (S13a)Contestednot in play

An integrated cost base cannot idle through speculative demand swings; Japan's integrated makers on private orders are the counterexample unless their demand is shown continuous.

Against the record
contradicted by Japan industrialised housing (Sekisui House, Daiwa House and peers) · consistent with the failure of Katerra
Evidence cases named
Lustron Corporation; Katerra; Japan industrialised housing (Sekisui House, Daiwa House and peers)
What would move it
Contested on the first pass: Japan's integrated makers run on private orders as assigned. Order-book stability data for Sekisui House / Daiwa House across a downturn would settle it.
Origin
this session
K13requiresLocal envelope (S04b) → requires State preemption (S04c) | National siting (S04d)Contestednot in play

Locally set objective envelopes drift back toward discretion unless a higher level constrains them.

Against the record
contradicted by Japan industrialised housing (Sekisui House, Daiwa House and peers), Sweden factory-built single-family housing
Evidence cases named
California ADU state preemption; Japan industrialised housing (Sekisui House, Daiwa House and peers); Sweden factory-built single-family housing
What would move it
Contested on the first pass: Japan and Sweden run local objective envelopes without a higher backstop as assigned (Japan's zones are a national menu, which may belong in S04d). Re-read the S04 assignments before regrading.
Origin
this session (cold reads assume local; Lintel argues preemption)
K14enablesIncumbent gains (S05b) → enables State preemption (S04c)Untestednot in play

Preemption that gives incumbents a gain passed and produced output; preemption that only overrides carries the assent cost.

Against the record
no surviving case violates it
Evidence cases named
California ADU state preemption
What would move it
Passage and uptake of the 2024 manufactured-housing zoning laws (MD, ME, NH, RI), which give incumbents nothing.
Origin
Lintel Goal B; this session
K15requiresParallel set (S11c) → requires Lot production (S06c) | Formal open (S09c)Untestednot in play

A one-day set with a week of button-up presumes a lot serviced before the order and standard utility interfaces.

Against the record
no surviving case violates it
Evidence cases named
HUD-code manufactured housing, 1976-1997
What would move it
Measured set-to-occupancy times for HUD-code homes on prepared pads versus unprepared lots.
Origin
cold reads
K16requiresCatalog (S07c) → requires Type (S02b)Contestednot in play

A catalog saves time only if its entries are pre-approved; a catalog without type approval still meets per-house local review.

Against the record
contradicted by Sweden factory-built single-family housing · consistent with the failure of Lustron Corporation, Katerra
Evidence cases named
Japan industrialised housing (Sekisui House, Daiwa House and peers); Lustron Corporation; Sweden factory-built single-family housing
What would move it
Contested on the first pass: Swedish catalog houses pass per-house bygglov as assigned and the sector runs. Check whether Swedish type approval (typgodkännande) applies to houses; Lustron's per-jurisdiction record; Japanese confirmation times.
Origin
this session
K17requiresPrivate aggregation (S13c) → requires Mortgage at delivery (S14c)Untestednot in play

Deposit-paying buyers need financing that closes at delivery; without it the order book converts to nothing.

Against the record
no surviving case violates it
Evidence cases named
HUD-code industry, 1998-2004 (securitised chattel episode)
What would move it
Conversion rates of pre-qualified buyer registries to closings in any prefab market.
Origin
Lintel notes (financing as remaining piece)
K18enablesSelf-cert, audited (S03e) → enables Parallel set (S11c)Untestednot in play

A continuous in-plant quality record lets the site inspection sequence collapse to one visit.

Against the record
no surviving case violates it
Evidence cases named
HUD-code manufactured housing, 1976-1997
What would move it
HUD-code installation inspection counts versus site-built inspection counts.
Origin
cold reads
K19requiresCompany (S16c) → requires National (S01c) | Type (S02b) | Plant (S02c)Untestednot in play

A company can only start where the statute already exists; that is why the HUD-code type 'waits on no gates'.

Against the record
no surviving case violates it · consistent with the failure of Lustron Corporation, Katerra
Evidence cases named
Lustron Corporation; Katerra; HUD-code manufactured housing, 1976-1997
What would move it
A company that succeeded in factory housing under variant local codes with no statutory vehicle.
Origin
Lintel notes
K20requiresFactory + crews (S12b) → requires Chassis (S08b) | Volumetric (S08c) | Cores + panels (S08d) | Panelised (S08e)Untestednot in play

A factory workforce presupposes a factory product.

Against the record
no surviving case violates it
Evidence cases named
HUD-code manufactured housing, 1976-1997; Japan industrialised housing (Sekisui House, Daiwa House and peers)
What would move it
Definitional; retained so the workforce slot participates in layering.
Origin
this session
K21requiresChecker (S15c) → requires Checker (S02d)Untestednot in play

Insured checker liability presupposes a certified checker whose determination carries legal weight.

Against the record
no surviving case violates it
Evidence cases named
none
What would move it
Professional-liability insurance terms for Florida private providers.
Origin
Lintel notes
K22requiresManufacturer (S15b) → requires Catalog (S07c) | Chassis (S08b) | Volumetric (S08c) | Cores + panels (S08d) | Panelised (S08e)Untestednot in play

A manufacturer warranty presupposes a manufacturer: a catalog or factory product.

Against the record
no surviving case violates it
Evidence cases named
HUD-code manufactured housing, 1976-1997; Japan industrialised housing (Sekisui House, Daiwa House and peers)
What would move it
Definitional; retained so liability participates in layering.
Origin
this session

0625 sources · 4 unread leads

Sources

A source marked read: no is a lead that was not opened, and nothing graded rests on one. Rows in this project's own evidence register are cited as SRC-21:E-nnn and resolve there.